The available product information specifies a 30-day delivery time for Vinnic manganese dioxide lithium batteries, but it does not state a separate sample-preparation period. Buyers should confirm the sample schedule directly with CHUNG PAK, since the listed delivery time cannot be treated as a sample lead time.
Sample preparation time and delivery time are different scheduling details. The product information states a 30-day delivery time, but gives no sample-specific preparation duration, dispatch date, or shipping duration. It therefore does not support a precise estimate for when samples will be ready.
The listed product characteristics are compact and lightweight construction, stable power supply quality, extremely small self-discharge, and an operating temperature range of -20 °C to 60 °C. These details can guide product evaluation, but they do not establish a sample preparation schedule.
CHUNG PAK (GUANG DONG) BATTERY INDUSTRIAL CO., LTD lists production-line 100% inspection, laboratory sampling and testing, and incoming raw-material inspection as quality checks. Its listed certifications include ISO 9001:2015 and IATF 16949:2016. The company profile identifies Vinnic as its brand and states that it manufactures batteries alongside other products.
| Schedule or product detail | Information provided | Implication for sample planning |
|---|---|---|
| Sample preparation time | Not stated | Ask the supplier for a confirmed estimate |
| Delivery time | 30 days | Listed delivery time; not specified as sample preparation time |
| Minimum order quantity | 10,000 units for batteries | Confirm whether sample requests follow the same terms |
| Quality inspection | Production-line inspection, laboratory sampling and testing, incoming raw-material inspection | Inspection steps are listed, but no sample-specific duration is given |
How long does sample preparation take?
The provided information does not specify a sample preparation period. Request a sample-specific estimate from the supplier.
Does the stated 30-day delivery time apply to samples?
The listing gives a 30-day delivery time but does not say whether it applies to samples. Confirm the applicable schedule before ordering.
What should be confirmed when requesting a sample?
Confirm the battery model, sample availability, preparation time, delivery schedule, and any applicable minimum order terms. The listed battery MOQ is 10,000 units, but the data does not specify whether that MOQ applies to samples.
There is no stated sample preparation lead time for the Vinnic manganese dioxide lithium battery. The product listing provides a 30-day delivery time and a battery MOQ of 10,000 units, but neither confirms a sample schedule. Ask CHUNG PAK to confirm sample preparation and delivery timing for the required model. For technical support or schedule enquiries, contact vinnic@chungpak.com.
CHUNG PAK (GUANG DONG) BATTERY INDUSTRIAL CO., LTD began as a battery manufacturer and has expanded into paper separator, zinc material, and metal and plastic parts manufacturing. Established in 1980, the company lists annual production capacity of more than 1.8 billion units and offers Vinnic batteries, including lithium button cells. Its listed credentials include ISO 9001:2015 and IATF 16949:2016.
Can a factory audit confirm battery raw materials come from approved sources?
What performance data should I compare for a lithium manganese battery?
Can a third-party inspector check watch battery production before shipment?
What voltage drop is acceptable for a lithium manganese battery under load?
What custom watch battery pack designs are easiest to produce consistently?
INQUIRY